Product Details
Place of Origin: China
Payment & Shipping Terms
Minimum Order Quantity: 10pcs
Price: 0.05USD-0.15USD
Packaging Details: Plastic Bag+Chipboard Carton+Plywood Pallet Pallet with Belt&Plastic Film.
Delivery Time: 15days
Supply Ability: 50000 pcs a week
Name: |
Metal Nut |
Standard: |
DIN,ASME,ASNI,ISO |
Material: |
Steel,Stainless Steel,Brass,Copper,Titanium Alloy,,Plastic |
Place Of Origin: |
China |
Finish: |
Polish,Passication,black ,galvanization,Chromate,Dacromet |
Certificate: |
ISO9001:2008,ROHS |
Used: |
Building Industry Machinery |
Thread Type: |
Coarse, Fine |
Usage: |
Fastening |
Function: |
Connection,Fastening And Decoration |
Strength: |
High |
Size: |
Various Sizes Available |
Measurement System: |
INCH,metric System |
Name: |
Metal Nut |
Standard: |
DIN,ASME,ASNI,ISO |
Material: |
Steel,Stainless Steel,Brass,Copper,Titanium Alloy,,Plastic |
Place Of Origin: |
China |
Finish: |
Polish,Passication,black ,galvanization,Chromate,Dacromet |
Certificate: |
ISO9001:2008,ROHS |
Used: |
Building Industry Machinery |
Thread Type: |
Coarse, Fine |
Usage: |
Fastening |
Function: |
Connection,Fastening And Decoration |
Strength: |
High |
Size: |
Various Sizes Available |
Measurement System: |
INCH,metric System |
1,Description:
Nuts are nuts, and bolts or screws screwed together to play a fastening role of the parts, all production and manufacturing machinery must be used according to the different materials, divided into carbon steel, stainless steel, non-ferrous metals (such as copper) and other major types.
material | |||||
aluminium | Aluminum has excellent thermal and electrical conductivity. However, aluminum is naturally soft and may produce gelatinous buildup after processing. If not properly operated, it is difficult to cut during processing. | ||||
titanium | Edm machining is well suited for titanium because the process can withstand the viscosity of this alloy and break down lengthy chips. However, deionized water is needed as a medium to help control the heat generated during processing. |
||||
steel | Steel is a very strong metal, and many manufacturers tend to use wire cutting machines instead of CNC machines for machining complex steel features. However, this material generates a lot of heat, so necessary precautions need to be taken. | ||||
brass | Brass has a high tensile strength and is easy to cut by machine. But the cutting speed should be slow because it is a soft metal. | ||||
4,Feature Advantage:
Corrosion resistance, wear resistance, high hardness
Stainless steel screw surface corrosion prevention treatment refers to the use of various methods to apply a maintenance layer on the metal surface, its role is to isolate the metal and the corrosive environment, to inhibit the corrosion process, or reduce the corrosive medium and the metal surface contact, so as to avoid or reduce the purpose of corrosion.
Excellent corrosion resistance**: Both 316 and 316L contain 2-3% molybdenum, which gives them stronger corrosion resistance compared to the 304 series, especially in chloride environments like saltwater, making them suitable for high-corrosion settings.
Stainless steel screws are made of metal, and metal corrosion prevention methods mainly have four aspects, that is, the nature of the material itself, the use of the environment, the interface of data and the environment and the improvement of metal structure design, if the use of complete corrosion resistant alloy to manufacture stainless steel screws, unless there are special needs, otherwise in the economic concept is not cost-effective, It is also impractical to completely isolate the external surface of the screw from corrosive environmental elements. Improved metal structure design can improve the impact of special circumstances in a certain situation, but the design of most stainless steel screws can not be fully corrected, and its maintenance role is not permanent, so this method can not deal with the basic problem, as long as the surface corrosion prevention, that is, the appearance of corrosion prevention treatment is the most widely used method.
5,About us
6.FAQ
A: We are factory and OEM are available.
A: Generally it is 7-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: 30% T/T in advance ,balance before shippment or L/C.
If you have another question, pls feel free to contact us as below: